- Wallpapers/Wall Coating[2]
- Mouse Pads[7]
- Tiles[1]
- Plastic Flooring[10]
- Plastic Crafts[1]
- Mat[10]
- Play Mats[1]
- Other Outdoor Toys & Structures[1]
- Artificial Grass & Sports Flooring[10]
- Gymnastics[1]
- Rubber Flooring[1]
- Garden Ornaments[1]
- Car Mats[1]
- Engineered Flooring[1]
- Table Cloth[2]
- Contact Person : Ms. tian sunny
- Company Name : Shijiazhuang Decking Athletic Facilities Co., Ltd.
- Tel : 86-311-83839586
- Fax : 86-311-83839569
- Address : Hebei,Shijiazhuang,NO.303 Shengli Road Shijiazhuang City
- Country/Region : China
- Zip : 050091
PVC sports flooring
Width of single roll: 1.42m 1.5m 1.8m
Length of roll: 15m 20m
Surface patterns : litchi,dene, maple wood,leather,cloth,
Thickness of wear-resisting layer: 1.2-1.5mm
Total thickness: 3.5mm 4.0mm 4.5mm 6mm 8mm
.
.
.
.
The flooring main is use of indoor compete and equipment for volleyball sports,table tennis
sports,badminton sports,basketball sports,tennisball sports and be also suit of
kindergarten,all various of gymnasium.
Technical features1. environmentalOur products are mainly PVC matericals.Such as non-toxic,tasteless,waterproof,and anti-mildew.Our products have been cerificated by GB185832. qualityThe products use fiber-grass reinforce layer and waterproof layer, the feature can keep the floor flat and firm.3. durability the PVC wear resisiting layer make the floor more resisttant to stretch and a long life span.4. cleaningthe PVC surface has the ability to repel the outside pollution. For the super ficial pollution,cleaning it with the soap easily. If the floor is extremely dirty ,neutral cleaning agent clould be used.5. sound-absorbingthe flooring lines are treated with a special processing,so it can aviod the sound pollution.6. decouple the foaming buffer layer of flooring can protect athletes,proventing person hurting.
Installation and MaintenanceBasic Requests:1. The construction ground must be kept clean, lasting dry and without any crack. The rate of moisture in the concrete ground mustn't surpass 2.5% and the rate of moisture in the gypsum floor mustn't surpass 0.5%. 2. The floors must be spreaded out and layed on the ground for more than 24 hours and the temperature at the scene mustn't be lower than 15. The floors are installed after reduction.The Ways of Installation Active Installation, Fixed Installation, Jointing Installation.1. Active Installation: Special cementation tape will be used between the floors and there is no cementation tape between the floor and the ground so that the floors can move easily. 2. Fixed Installation: It is a partial cementation. Brush 15cm into the ground and glue them together with the edge of the floor as the criteria.3. Jointing Installation: Slot on the surface of the floor before welding it by hand or by machine. The slot place must keep clean. The welding temperature mustn't be lower than 500.The welding can be operated by entirely automatic equipment or by manual control. Use a short line to test the temperature and the speed before welding. Then we take two steps to remove the reduntant welding line after cooling. Firstly we use the crescent moon shovel to remove the half of the bulge of weling line. Then remove the remains after it is fully cool. Maintenance:The PVC surface has the repel ability to the outside pollution. For the superficial pollution, clean it with the swab easily. If the floor is extrmemely dirty, neutral cleansing agent will be used for the extremely dirt.The expense for maintenance is cheap.
PVC sports flooring