Shijiazhuang Decking Athletic Facilities Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. tian sunny
  • Company Name : Shijiazhuang Decking Athletic Facilities Co., Ltd.
  • Tel : 86-311-83839586
  • Fax : 86-311-83839569
  • Address : Hebei,Shijiazhuang,NO.303 Shengli Road Shijiazhuang City
  • Country/Region : China
  • Zip : 050091

PVC sports flooring.

PVC sports flooring.
Product Detailed
Width of single roll: 1.42m 1.5m 1.8m Total thickness: 3.5 4.0 4.5 6 8mm Surface patterns : all kinds of your requirement

Width of single roll: 1.42m 1.5m  1.8m

Length of roll: 15m 20m

Surface patterns : litchi,dene, maple wood,leather,cloth,

Thickness of wear-resisting layer: 1.2-1.5mm

Total thickness: 3.5mm 4.0mm 4.5mm 6mm 8mm

.

.

.

.

The flooring main is use of indoor compete and equipment for volleyball sports,table tennis

sports,badminton sports,basketball sports,tennisball sports and be also suit of

kindergarten,all various of gymnasium.

Technical features1. environmentalOur products are mainly PVC matericals.Such as non-toxic,tasteless,waterproof,and anti-mildew.Our products have been cerificated by GB185832. qualityThe products use fiber-grass reinforce layer and waterproof layer, the feature can keep the floor flat and firm.3. durability the PVC wear resisiting layer make the floor more resisttant to stretch and a long life span.4. cleaningthe PVC surface has the ability to repel the outside pollution. For the super ficial pollution,cleaning it with the soap easily. If the floor is extremely dirty ,neutral cleaning agent clould be used.5. sound-absorbingthe flooring lines are treated with a special processing,so it can aviod the sound pollution.6. decouple the foaming buffer layer of flooring can protect athletes,proventing person hurting.

Installation and MaintenanceBasic Requests:1. The construction  ground must be kept clean, lasting dry and without any crack. The rate of  moisture in the concrete ground mustn't surpass 2.5% and the rate of moisture  in the gypsum floor mustn't surpass 0.5%.                     2. The floors must be  spreaded out and layed on the ground for more than 24 hours and the temperature  at the scene mustn't be lower than 15.  The floors are installed after reduction.The Ways of Installation Active Installation, Fixed Installation, Jointing Installation.1. Active Installation: Special cementation tape will be used between the floors and there is no cementation tape between the floor and the ground so that the floors can move easily. 2. Fixed  Installation: It is a partial cementation. Brush 15cm into the ground and glue  them together with the edge of the floor as the criteria.3. Jointing Installation:  Slot on the surface of the floor before welding it by hand or by machine. The  slot place must keep clean. The welding temperature mustn't be lower than 500.The welding can be operated by entirely  automatic equipment or by manual control. Use a short line to test the  temperature and the speed before welding. Then we take two steps to remove the  reduntant welding line after cooling. Firstly we use the crescent moon shovel  to remove the half of the bulge of weling line. Then remove the remains after  it is fully cool. Maintenance:The PVC surface has the  repel ability to the outside pollution. For the superficial pollution, clean it  with the swab easily. If the floor is extrmemely dirty, neutral cleansing agent  will be used for the extremely dirt.The expense for maintenance is cheap.

PVC sports flooring.



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.